Design and permitting of eight PV Plants for AES in Silistra province, Bulgaria, with a total of 27 MWp.
Bates acted as a design subcontractor under Biosar Greece and was responsible for the development, adaptation and authorization of the detailed design in compliance with the Bulgarian law. During the construction the Bates engineers carried out authorship supervision.