Bates was involved in the development and adaptation of the detailed design and acted as a project manager during the construction. The design included the development of specific industrial systems and networks related to the loading and unloading, transportation and storage of petrol products. Fuel storage tanks and administration building, forecourt technology and firefighting systems were designed in accordance with the production and legal requirements. The projects were completed in 2005.