TE-TO Pančevo

Continuing our long term successful cooperation, BATES was appointed by NIS Gasprom for Site Supervision and Design Review on the Te-To Information Centre project in Pančevo. The future visitor centre will have two floors and will be a useful addition to the existing facilities. The construction is ongoing, and expected to be completed in 2018.